Preliminary Site Screen
Find the early site issues that deserve a closer look.
A planning-level screen that organizes available evidence around your project decision—without pretending public data answers what still needs verification.
Founding offer
A focused first look at one site.
Best for early acquisition, development, access, utility, civil, and infrastructure decisions where the team needs a documented starting point.
CEI confirms location, scope fit, available coverage, and achievable timing before sending the payment route.
Founding price
One defined site · six-page PDF · target delivery within three business days after scope, necessary inputs, authorization, and payment are confirmed.
Scope and timing are confirmed before payment.Included
- One identifiable site or defined review area
- Available public and client-provided aerial context
- FEMA flood-hazard and NWI wetlands screening
- Selected relevant parcel, jurisdictional, environmental, historic-resource, and infrastructure sources
- Priority findings, source dates, data gaps, and verification steps
- Branded six-page PDF and one clarification email
Outside this scope
- Drone flight, field visit, or current orthomosaic
- Survey-grade boundaries, elevations, or measurements
- Wetland delineation or environmental determination
- Title, zoning, engineering, or regulatory opinion
- Utility locate or concealed routing/capacity verification
- Undefined corridors, portfolios, or unlimited revisions
Preliminary screen / sample
The same site. A focused preliminary scope.
This six-page sample is derived from the Sample ASI. It uses the existing site context and desktop findings, with source gaps and next steps made explicit. It does not include a new flight, fieldwork, or fresh public-data screening.

Desktop scope
A documented starting point.
Review site context, source-reported flood and wetlands findings, infrastructure records, and evidence gaps. Each topic identifies the next verification needed.
New field utility inventories, aerial capture, and dimensional checks belong to the separately scoped ASI.
Six-page structure
Context. Findings. Next actions.
Reported findings link back to the original ASI pages. Missing dataset dates and conflicting statements stay visible instead of becoming unsupported assurances.
Open preliminary sample Compare the full ASIQualification comes first
Send the site before you pay.
We will confirm that the request fits this offer and that the necessary sources are available.
